> ## Content Index
> Fetch the complete content index at: https://www.thecalcasieupost.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# 22.4 Million Tons of CO₂ Could Be Stored Underground Near Carlyss. Public Hearing Thursday at West Cal Events Center
- URL: https://www.thecalcasieupost.com/22-4-million-tons-of-co2-could-be-stored-underground-near-carlyss-public-hearing-thursday-at-west-cal-events-center/
- Published: 2026-11-02T14:32:12.000Z
- Updated: 2026-11-02T15:17:52.000Z
- Author: The Calcasieu Post

**CARLYSS, La.** — Carbon capture pipelines have generated controversy across Southwest Louisiana, but what happens when all that carbon dioxide reaches its destination? A Houston-based company wants to establish a permanent underground storage site near Carlyss, where approximately **22.4 million metric tons of CO₂** could be injected beneath southern Calcasieu Parish over the next 15 years. Residents will have an opportunity to weigh in Thursday evening when state regulators hold a public hearing at the West Cal Events Center.

Gulf Coast Sequestration LLC is seeking permission to construct and operate two Class VI injection wells as part of its Goose Lake project. Unlike pipelines that transport carbon dioxide from industrial facilities, these wells would inject it into the Upper Frio Formation approximately 10,140 to 11,727 feet underground. The state’s public notice identifies the base of the lowermost underground source of drinking water at approximately 1,110 feet, placing the proposed storage formation thousands of feet below the region’s underground drinking-water resources.

**The distinction matters for Carlyss residents because this project concerns where captured carbon dioxide would be permanently stored, not simply where a pipeline would pass.** The proposed wells would serve as an underground destination for CO₂ transported to the site, although specific pipeline connections have not been established in the public notice. The project would be subject to Class VI regulations intended to protect underground drinking-water sources, with monitoring and regulatory oversight extending beyond the injection period.

Some project opponents are questioning whether the state’s review adequately considers nearby underground carbon-storage operations. They have raised concerns about potential overlap with the already permitted Hackberry Sequestration project, how underground pressure from multiple injection sites could interact, and whether those pressure changes could affect the nearby Strategic Petroleum Reserve. Critics have also questioned community-engagement requirements, alleging that regulators accepted an engagement plan for a previously approved project without requiring evidence that it was carried out. These claims identify specific questions residents can raise about the proposed permit.

**The public hearing is Thursday, November 5, at 6 p.m. at the West Cal Events Center, 401 Arena Road in Sulphur.** Residents who cannot attend may submit written comments through **4:30 p.m. Friday, November 6**, by emailing [Injection-Mining@la.gov](mailto:Injection-Mining@la.gov). Comments should reference **GCS Goose Lake — Draft Order No. UIC 2026-12 GS**, covering Applications 45039 and 45040\. The draft permit has not received final approval, and state regulators will consider public comments before making their decision.